Vertical Storage System

Case Study

Engine Power Source (supplier of engine parts for forklifts, generators & similar motors)

Project: Implement vertical storage system to reduce picking time

Engine Power Source (EPS) customers need parts ASAP. The ability to ship without error quickly and to have the proper parts in stock is crucial. EPS was storing their parts in a 40' x 40' 2-level shelving catwalk mezzanine. Parts picking required a lot of walking and transport of parts between levels. EPS decided to move into a new facility and consolidate the parts into vertical storage system units to take advantage of the 18' vertical height of the building.

Advanced Equipment Company consolidated the parts from shelving into three (3) 9' x 9' Hanel Lean Lifts for their vertical storage system. Parts are now protected from dust and are brought quickly to the operator through this vertical storage system. The picking window is well lighted and at a comfortable height. Picking speed has increased dramatically, along with inventory accuracy, and the ability to serve EPS customers.

Products Used:

Advanced Equipment Company provides turnkey material handling systems throughout North Carolina and South Carolina, with service in Charlotte, Asheville, Greensboro, Raleigh, Greenville/Spartanburg, Columbia, Charleston, Florence, Orangeburg, Hickory, Statesville, Winston-Salem, Durham and Fayetteville.

Advanced Equipment Company | 118 Clanton Road | Charlotte NC 28217 | 704-527-3141